Darwin Aquaculture Centre

Construction of New Wash Down Bay in an environmental controlled site. The project required the removal of adjacent fence line and flora on eastern side of proposed site to allow alternate access to area.

Project Snapshot

Construction site with equipment and fencing.

Project Overview

Construction of New Wash Down Bay in an environmental controlled site. The project required the removal of adjacent fence line and flora on eastern side of proposed site to allow alternate access to area. The installation of bypass track to wash down bay to facilitate alternate access, concrete footing, under slab works, install inground tanks, install concrete slab and drive way, install steelworks, install road crossing drainage, install fox environmental system, install electrical conduit and upgrade switchboard, obtain as built drawings & Section 40 construction & building permit. All works comply with BCA / NCC relevant Australian Acts, Codes and Standards applicable to the works, the requirements of the Building Certifier, the requirements of NT Fire and Rescue Service Authority, the requirements of Power and Water authority and industry best practice.

Gallery

Client Testimonial

❝ Gold Medal Services took the time to understand our operational requirements, including heavy vehicle access, drainage, trade waste management, and environmental controls. The design incorporated practical features such as graded concrete, effective bunding, compliant drainage, and separation systems to ensure we meet regulatory obligations while maintaining efficiency on site. Communication throughout the project was clear and consistent. Programming was realistic, disruptions to operations were minimised, and all works were completed to a high standard. The team coordinated trades effectively and ensured all relevant standards and approvals were addressed prior to completion. Since commissioning, the wash down bay has improved our maintenance processes, reduced environmental risk, and provided a safe, purpose-built area for cleaning plant and vehicles. ❞
Cameron Hartley
Share Project
More Projects
Construction site with blue pipes and equipment.
Facilities & Asset Management
CBRE – BOC Gas Facility

Project Overview The works included seven new hydrants, two fire hose reels, a new H-Pattern Assembly, two 4.5kL water tanks,

Excavation site with pipes and construction materials.
Facilities & Asset Management
Advanced Civil – Girraween

Project Overview The works required engineered solutions for two open uncovered drain (OUD) crossings, incorporating vertical bends, flange-to-flange pipe sections,