Featured Case Studies

Our Work

Construction site with blue pipes and equipment.
Facilities & Asset Management
CBRE – BOC Gas Facility

Project Overview The works included seven new hydrants, two fire hose reels, a new H-Pattern Assembly, two 4.5kL water tanks,

Construction site with equipment and fencing.
Facilities & Asset Management
Darwin Aquaculture Centre

Project Overview Construction of New Wash Down Bay in an environmental controlled site. The project required the removal of adjacent

Excavation site with pipes and construction materials.
Facilities & Asset Management
Advanced Civil – Girraween

Project Overview The works required engineered solutions for two open uncovered drain (OUD) crossings, incorporating vertical bends, flange-to-flange pipe sections,