CBRE – BOC Gas Facility
Project Overview The works included seven new hydrants, two fire hose reels, a new H-Pattern Assembly, two 4.5kL water tanks,

Project Overview The works included seven new hydrants, two fire hose reels, a new H-Pattern Assembly, two 4.5kL water tanks,

Project Overview Construction of New Wash Down Bay in an environmental controlled site. The project required the removal of adjacent

Project Overview The works required engineered solutions for two open uncovered drain (OUD) crossings, incorporating vertical bends, flange-to-flange pipe sections,