Project Overview
Construction of New Wash Down Bay in an environmental controlled site. The project required the removal of adjacent fence line and flora on eastern side of proposed site to allow alternate access to area. The installation of bypass track to wash down bay to facilitate alternate access, concrete footing, under slab works, install inground tanks, install concrete slab and drive way, install steelworks, install road crossing drainage, install fox environmental system, install electrical conduit and upgrade switchboard, obtain as built drawings & Section 40 construction & building permit. All works comply with BCA / NCC relevant Australian Acts, Codes and Standards applicable to the works, the requirements of the Building Certifier, the requirements of NT Fire and Rescue Service Authority, the requirements of Power and Water authority and industry best practice.